:::
  • Less-Developed Engineering Methods
    • The entire area maintains a forest coverage rate of 50% and we have kept 30% of the ecological conservation areas.
    • During the site preparation we used natural slopes, reinforced retaining walls or stacked-stone retaining walls to stabilize the campus area. Maintaining a high porosity these slopes can be planted to become green ecological slopes. We have refrained from using concrete retaining walls for the entire campus area.